Home Page NVS RO NVS HQ C.B.S.E NCERT City Web Portal RTE RTI facebook tweeter google linked in you tube


Thought of the Day : इससे पहले कि सपने सच हों आपको सपने देखने होंगे . BY: - ABDUL KALAM

Infrastructure

I

Area of land  allotted (in acres)

Whether land transferred in the Name of Samiti

Vidyalaya shifted to permanent buildings on

: 30 ACRES

: YES

: YES

ii

Status of Boundary Wall

a.  Brick Wall

b.  Barbed wire fencing

 

COMPLETED

iii

Permanent buildings constructed

CBRI PATTERN

iv

School building

COMPLETE

v

Dormitories

:  Boys 04 Nos.08 HOUSE

with Warden Residence 02  Nos.

:  Girls 02 Nos.

with Warden Residence 02 Nos. (02 HOUSE)

vi

Kitchen/dining Hall

No. of shifts required for all students  to take food

 

COMPLETE

ONE SHIFT

vii

Principal Residence

:  ___ No.

TYPE IV- 01 NO

viii

Staff Quarters

: Type III =  24 Nos.

Type II = 0 Nos.

Type  I  = 12 Nos.

SP Sheds converted into Staff Qrs.: NILNos.

ix

M.P. Hall

NOT AVAILABLE

x

Workshop

NOT AVAILABLE

xi

Type of O.H. Tank

Its capacity

Present Status

: Shaft type / Column based

:  1LACK liters

SATISFACTORY

xii

U.G. tank

Its capacity

Present Status

:  1.35  liters

:

xiii

D.G. Set

: _____________ make

:   ______ KV

: NOT WORKING

: Year of procurement

xiv

Sewage Pump

: 10 H.P. & 05 HP

xv

Water Pump

: ________ capacity

xvi

Electrification

Electric connection

Sub Station building

Street lighting

Numbers of hrs. during day when power supply is available on an average.

:  Rural / Urban Feeder RURAL

INCOMPLETE

:  50 Nos. of Poles

:  11 hrs.

xvii

Playfields

400 metre track

40 x 30 metre basket ball court

40 x 30 metre volley ball court

 

:  01 Nos.

:  01 Nos.

xviii

Water supply

Tube Well

Hand pump

Connection from PHED

: Potable,  02 Nos.-  WORKING

: Potable, 01 Nos

:  ______ hours supply in a day

xix

Rajiv Gandhi Smriti Van

: AVAILABLE

xx

Fire fighting arrangement

: WORKING

xxi

Last date of cleaning of

(a) Septic tank

(b) Water tanks

:TIME TO TIME

:

xxii

Whether area around transformer is fenced

:   YES

xxiii

Whether open wells, if any, are covered from top

:   YES